Qom Government :
Qom-Garmsar Railway

Development of Qom-Garmsar Railway


Line Description
This line will be developed adjacent to Qom-Garmsar Freeway and finally it will be a part of Haram-to-Haram railway.
The line is 140Km long, 45Km of which is in Qom Provincial Region

Railway Specifications
1. UIC60 Rails
2. B70 Concrete traverse
3. Minimum arc radios of 700
4. Blast based on technical standards
5. UIC60 Switch point

Operations and Costs
Since 45Km of the whole 140Km railways is inside Qom provincial region the project including signaling requirements will need 97 million dollars(for provincial region)

Railway Development Outcomes
1. Establishment of a direct route from Qom to northeast
2. Improved railway connection from northeast to south and central regions
3. Passive Defense foundations
4. Reduced travel time and increased speed
5. Improved satisfaction for the pilgrimage to sacred places
6. Reduced energy costs
7. Reduced shipping amortization

 


All rights reserved